최신IASSC Certified Lean Six Sigma Green Belt - ICGB무료샘플문제
문제1
When constructing a Fishbone Diagram using the ________ approach is the most classic arrangement.
When constructing a Fishbone Diagram using the ________ approach is the most classic arrangement.
정답: D
문제2
The Accuracy of a Measurement System addresses _________________.
The Accuracy of a Measurement System addresses _________________.
정답: B
문제3
To create standardization of financial benefit calculations project savings are typically based on savings over what period of time?
To create standardization of financial benefit calculations project savings are typically based on savings over what period of time?
정답: B
문제4
Customers make a purchase decision based on a number of factors. In Lean Six Sigma we refer to these decision points as CTQ's which stands for __________.
Customers make a purchase decision based on a number of factors. In Lean Six Sigma we refer to these decision points as CTQ's which stands for __________.
정답: C
문제5
Non-parametric testing is done when which of these are applicable? (Note: There are 3 correct answers).
Non-parametric testing is done when which of these are applicable? (Note: There are 3 correct answers).
정답: A,B,C
문제6
As a type of measurement error, Linearity describes a change in accuracy through the expected operating range of the measurement instrument.
As a type of measurement error, Linearity describes a change in accuracy through the expected operating range of the measurement instrument.
정답: A
문제7
The Central Limit Theorem helps us understand the ___________ we are taking and is the basis for using sampling to estimate population parameters.
The Central Limit Theorem helps us understand the ___________ we are taking and is the basis for using sampling to estimate population parameters.
정답: B
문제8
If a process has Outliers which pair of charts is most preferable if subgroups will exist for the Continuous Data?
If a process has Outliers which pair of charts is most preferable if subgroups will exist for the Continuous Data?
정답: C
문제9
When creating a Cause and Effect Diagram the team needs to continually broaden their view as well as drill down until they identify all the potential ______________ impacting their process.
When creating a Cause and Effect Diagram the team needs to continually broaden their view as well as drill down until they identify all the potential ______________ impacting their process.
정답: C
문제10
A Belt gathered the following defect data for a shoe production line and wanted to assemble it into a Pareto Chart. The correct order from left to right in the chart would be:
Data: Cutting38 Forming17 Stitching56 Sealing42
A Belt gathered the following defect data for a shoe production line and wanted to assemble it into a Pareto Chart. The correct order from left to right in the chart would be:
Data: Cutting38 Forming17 Stitching56 Sealing42
정답: D
문제11
Significant variation in process performance is a consequence of several causes that can be classified using which of the terminologies shown. (Note: There are 2 correct answers).
Significant variation in process performance is a consequence of several causes that can be classified using which of the terminologies shown. (Note: There are 2 correct answers).
정답: B,C
문제12
The very best way to begin an effort to map a process is to do which of these?
The very best way to begin an effort to map a process is to do which of these?
정답: C
문제13
Which of these is Discrete data?
Which of these is Discrete data?
정답: B