최신IBM Sterling Order Management v10.0 and Order Management on Cloud Architect - C1000-133무료샘플문제
문제1
Which three of the following can be configured to be used to compute the landed cost used for cost-based optimization? (Select three.)
Which three of the following can be configured to be used to compute the landed cost used for cost-based optimization? (Select three.)
정답: A,B,C
문제2
An implementation professional needs to assign Roles to the Participants based on the following table:

Which is the correct way to map the Roles to the Participants?
An implementation professional needs to assign Roles to the Participants based on the following table:

Which is the correct way to map the Roles to the Participants?
정답: A
문제3
In IBM Sterling Order Management (OMS), an implementation professional needs to define the menu options that a specific user will see. How should this requirement be configured?
In IBM Sterling Order Management (OMS), an implementation professional needs to define the menu options that a specific user will see. How should this requirement be configured?
정답: C
문제4
In which scenario would an implementation professional add a new entry in the customer_overrides.properties file?
In which scenario would an implementation professional add a new entry in the customer_overrides.properties file?
정답: B
문제5
In the following scenario, the system should avoid locking in YFSJNVENTORYJTEM until the overall availability is low (150).

How can this requirement be modeled in the system?
In the following scenario, the system should avoid locking in YFSJNVENTORYJTEM until the overall availability is low (150).

How can this requirement be modeled in the system?
정답: B
문제6
When considering supply and demand for a particular node with a sufficient supply, orders for the node are backordered when availability calculations are made for the configured demand type.
What must the implementation professional do to prevent backorder?
When considering supply and demand for a particular node with a sufficient supply, orders for the node are backordered when availability calculations are made for the configured demand type.
What must the implementation professional do to prevent backorder?
정답: A