최신SAP Certified Application Associate - Production - Planning & Manufacturing with SAP ERP 6.0 EHP5 - C-TSCM42-65무료샘플문제
문제1
The stock/requirements list for a finished product contains only one customer order and one fixed planned order with the same quantity. The availability dates for both MRP elements are on working days. The availability date of the fixed planned order is set to a later date compared to the one of the customer order. However, a corresponding rescheduling exception message does not occur.
What could be the reason? (Choose two)
The stock/requirements list for a finished product contains only one customer order and one fixed planned order with the same quantity. The availability dates for both MRP elements are on working days. The availability date of the fixed planned order is set to a later date compared to the one of the customer order. However, a corresponding rescheduling exception message does not occur.
What could be the reason? (Choose two)
정답: B,C
문제2
During a project phase, your customer raises some questions concerning parameters of the procurement type in the material master in the SAP ECC system.
Which of the following procurement type properties are valid? (Choose two)
During a project phase, your customer raises some questions concerning parameters of the procurement type in the material master in the SAP ECC system.
Which of the following procurement type properties are valid? (Choose two)
정답: A,B
문제3
Which of the following requirements is supported by using process orders?
Which of the following requirements is supported by using process orders?
정답: C
문제4
You want to produce a finished product only when it is requested by a customer order in make-to-order production. However, all assemblies need to be procured beforehand.
How can you fulfill these requirements in SAP ECC? (Choose two)
You want to produce a finished product only when it is requested by a customer order in make-to-order production. However, all assemblies need to be procured beforehand.
How can you fulfill these requirements in SAP ECC? (Choose two)
정답: C,D
문제5
When analyzing the SAP ECC order report for a planned order for a finished product, you discover that one of the assemblies will not be available in time for the scheduled final assembly because of automatic forward scheduling.
Which planning procedure do you use to create a feasible production plan from a requirements planning perspective?
When analyzing the SAP ECC order report for a planned order for a finished product, you discover that one of the assemblies will not be available in time for the scheduled final assembly because of automatic forward scheduling.
Which planning procedure do you use to create a feasible production plan from a requirements planning perspective?
정답: B
문제6
Where in the SAP ECC system can you define production versions?
Where in the SAP ECC system can you define production versions?
정답: D
문제7
In SAP ECC, you calculate the standard available capacity for a work center capacity using the following data:
-Start: 7:00:00 a.m.
-End: 3:00:00 p.m.
-Break duration: 1 hour
-Rate of utilization: 80%
-Overload: 110%
-Number of individual capacities: 1
How large is the standard available capacity?
In SAP ECC, you calculate the standard available capacity for a work center capacity using the following data:
-Start: 7:00:00 a.m.
-End: 3:00:00 p.m.
-Break duration: 1 hour
-Rate of utilization: 80%
-Overload: 110%
-Number of individual capacities: 1
How large is the standard available capacity?
정답: C
문제8
You want to send production order-related data like confirmations, goods receipts, goods issues, and other user-specific actual data from an external process control system to SAP ECC.
How can you fulfill this requirement?
You want to send production order-related data like confirmations, goods receipts, goods issues, and other user-specific actual data from an external process control system to SAP ECC.
How can you fulfill this requirement?
정답: B