문제1
IEEE 10440-1993 specifies a standard for defect reporting.
Which of the following attributes should be in a defect report as per ISTQB Syllabus?
IEEE 10440-1993 specifies a standard for defect reporting.
Which of the following attributes should be in a defect report as per ISTQB Syllabus?
정답: D
문제2
Select the correct state transition diagram for the following train door open/close scenario.
When the train is moving, the train doors are closed. After train stops at a station, doors will be opened by the operator, passengers take off and new passengers board the train.
Doors will be opened for 40 seconds at the train station. Train doors will be closed when the train is not in service.

Select the correct state transition diagram for the following train door open/close scenario.
When the train is moving, the train doors are closed. After train stops at a station, doors will be opened by the operator, passengers take off and new passengers board the train.
Doors will be opened for 40 seconds at the train station. Train doors will be closed when the train is not in service.

정답: D
문제3
According to the ISTQB syllabus, domain testing quality attributes are;
I. Accuracy, Suitability, Interoperability
II. Reliability, Maintainability, Portability
III. Performance, load, Adaptability
According to the ISTQB syllabus, domain testing quality attributes are;
I. Accuracy, Suitability, Interoperability
II. Reliability, Maintainability, Portability
III. Performance, load, Adaptability
정답: B
문제4
Select the correct answer;
I. IEEE 829 contains a standard for test summary report.
II. Test reporting can occur at the end of the testing effort.
III. Percentage of test time lost due to blocking events is not a valid metric to monitor.
IV. Test summary report may contain summary of testing activities, versions of the software tested and management approvals.
Select the correct answer;
I. IEEE 829 contains a standard for test summary report.
II. Test reporting can occur at the end of the testing effort.
III. Percentage of test time lost due to blocking events is not a valid metric to monitor.
IV. Test summary report may contain summary of testing activities, versions of the software tested and management approvals.
정답: A
문제5
According to ISTQB syllabus, characteristics of systems of systems are;
I. Long duration of projects
II. Multiple levels of integration
III. Need for Maintenance Testing
IV. No formal development lifecycle or milestones.
According to ISTQB syllabus, characteristics of systems of systems are;
I. Long duration of projects
II. Multiple levels of integration
III. Need for Maintenance Testing
IV. No formal development lifecycle or milestones.
정답: D
문제6
A Junior software tester at ABC Inc. found a defect while testing release 2 of the eForm application. The eForm application does not accept more than 5 characters for its' "Last Name" field. Tester created a defect report. The defect report contains following information; "eForm application does not accept more than 5 characters for its' "Last Name" field" Select the correct statement regarding the defect report;
A Junior software tester at ABC Inc. found a defect while testing release 2 of the eForm application. The eForm application does not accept more than 5 characters for its' "Last Name" field. Tester created a defect report. The defect report contains following information; "eForm application does not accept more than 5 characters for its' "Last Name" field" Select the correct statement regarding the defect report;
정답: A
문제7
Which of the following is NOT a challenge with outsourcing?
Which of the following is NOT a challenge with outsourcing?
정답: B
문제8
Select the correct statement regarding test planning and control
Select the correct statement regarding test planning and control
정답: C