최신SAP Certified Application Associate - Production Planning & Manufacturing with SAP ERP 6.0 EHP7 - C_TSCM42_67무료샘플문제
문제1
Which of the following are characteristics of ECC master production scheduling (MPS)? (Choose three)
Which of the following are characteristics of ECC master production scheduling (MPS)? (Choose three)
정답: A,C,D
문제2
Which of the following master data is necessary for the creation of material reservations for production orders?
Which of the following master data is necessary for the creation of material reservations for production orders?
정답: A
문제3
Which of the following activities is necessary for the capacity availability check that can be carried out automatically when a production order is released?
Which of the following activities is necessary for the capacity availability check that can be carried out automatically when a production order is released?
정답: B
문제4
An enterprise based in the US produces an end product that is used with the unit of measure "pound" (LB).
The material is now to be marketed in the EU. A prerequisite for this is that the material can be sold with the unit "kilogram" (KG).
What is the easiest way to fulfill this requirement?
An enterprise based in the US produces an end product that is used with the unit of measure "pound" (LB).
The material is now to be marketed in the EU. A prerequisite for this is that the material can be sold with the unit "kilogram" (KG).
What is the easiest way to fulfill this requirement?
정답: A
문제5
Which of the following statements about consumption are correct? (Choose two)
Which of the following statements about consumption are correct? (Choose two)
정답: B,C
문제6
Which functions can be triggered before releasing a production order? (Choose three)
Which functions can be triggered before releasing a production order? (Choose three)
정답: A,C,E
문제7
The company you advise wants to carry out the material availability check automatically in the production order at various points in time. Which of the following options would you recommend? (Choose two.)
The company you advise wants to carry out the material availability check automatically in the production order at various points in time. Which of the following options would you recommend? (Choose two.)
정답: C,E
문제8
In which scenario will the error message shown in the attached screenshot occur?
Exhibit:

Exhibit
In which scenario will the error message shown in the attached screenshot occur?
Exhibit:

Exhibit
정답: D
문제9
Which of the following items of master data are needed for repetitive manufacturing? (Choose three)
Which of the following items of master data are needed for repetitive manufacturing? (Choose three)
정답: B,D,E