최신SAP Certified Application Associate - Production - Planning & Manufacturing with SAP ERP 6.0 EHP6 - C_TSCM42_66무료샘플문제
문제1
Which of the following functions are available in SAP ECC when using capacity leveling?(Choose three)
Which of the following functions are available in SAP ECC when using capacity leveling?(Choose three)
정답: A,B,C
문제2
Which function is supported by production orders?
Which function is supported by production orders?
정답: A
문제3
You want to use the different options for planning in SAP ECC.
What is the correct sequence of the planning procedures?
You want to use the different options for planning in SAP ECC.
What is the correct sequence of the planning procedures?
정답: B
문제4
You want to produce a finished product only when it is requested by a customer order in make-to-order production. However, all assemblies need to be procured beforehand.
How can you fulfill these requirements in SAP ECC?(Choose two)
You want to produce a finished product only when it is requested by a customer order in make-to-order production. However, all assemblies need to be procured beforehand.
How can you fulfill these requirements in SAP ECC?(Choose two)
정답: C,D
문제5
Where can you define the valid receivers for production order costs?
Where can you define the valid receivers for production order costs?
정답: B
문제6
Which repetitive manufacturing options can you use to carry out line loading in the SAP ECC system, and thus generate run schedule quantities (RSQ) from normal planned
orders?(Choose three)
Which repetitive manufacturing options can you use to carry out line loading in the SAP ECC system, and thus generate run schedule quantities (RSQ) from normal planned
orders?(Choose three)
정답: A,C,D
문제7
When analyzing the SAP ECC order report for a planned order for a finished product, you discover that one of the assemblies will not be available in time for the scheduled final assembly because of automatic forward scheduling.
Which planning procedure do you use to create a feasible production plan from a requirements planning perspective?
When analyzing the SAP ECC order report for a planned order for a finished product, you discover that one of the assemblies will not be available in time for the scheduled final assembly because of automatic forward scheduling.
Which planning procedure do you use to create a feasible production plan from a requirements planning perspective?
정답: B
문제8
In which scenario will the error message shown in the attached screenshot occur? Exhibit:

In which scenario will the error message shown in the attached screenshot occur? Exhibit:

정답: D