최신ISQI ISTQB Certified Tester Foundation Level - Specialist Performance Testing - CTFL-PT_D무료샘플문제
문제1
In which activity of the testing process are specific test conditions identified for performance testing?
SELECT ONE OPTION
In which activity of the testing process are specific test conditions identified for performance testing?
SELECT ONE OPTION
정답: B
설명: (ExamPassdump 회원만 볼 수 있음)
문제2
If Emily is conducting a performance test to determine that a system exposed to a load can respond to a high number of concurrent users during short periods of time that occur on specific days and at specific times, and then return to a stable state.
What type of performance testing is Emily conducting?
SELECT ONE OPTION
If Emily is conducting a performance test to determine that a system exposed to a load can respond to a high number of concurrent users during short periods of time that occur on specific days and at specific times, and then return to a stable state.
What type of performance testing is Emily conducting?
SELECT ONE OPTION
정답: B
설명: (ExamPassdump 회원만 볼 수 있음)
문제3
Identify the correspondences between the different tools (listed from 1 to 3) and their objectives and characteristics (listed from A to F).
1. Load generator.
2. Load management console.
3. Monitoring tool.
1. It monitors, records and/or analyzes the behavior of the component or system under test.
2. It creates the load and also collects the metrics for later communication.
3. It provides the control to start and stop the creation and execution of the user simulation.
4. It aggregates metrics from the various transactions that are defined within the load instances
5. It creates and runs multiple client instances that simulate user behavior.
6. It can effectively support a root cause analysis of performance in a system under test.
SELECT ONE OPTION
Identify the correspondences between the different tools (listed from 1 to 3) and their objectives and characteristics (listed from A to F).
1. Load generator.
2. Load management console.
3. Monitoring tool.
1. It monitors, records and/or analyzes the behavior of the component or system under test.
2. It creates the load and also collects the metrics for later communication.
3. It provides the control to start and stop the creation and execution of the user simulation.
4. It aggregates metrics from the various transactions that are defined within the load instances
5. It creates and runs multiple client instances that simulate user behavior.
6. It can effectively support a root cause analysis of performance in a system under test.
SELECT ONE OPTION
정답: A
설명: (ExamPassdump 회원만 볼 수 있음)
문제4
Choose the option that BEST describes valid opportunities for the dynamic performance testing.
SELECT ONE OPTION
Choose the option that BEST describes valid opportunities for the dynamic performance testing.
SELECT ONE OPTION
정답: A
설명: (ExamPassdump 회원만 볼 수 있음)
문제5
If George is testing in order to check the stability of a system for a specific period of time in an operational system context, what type of testing is MOST appropriate?
SELECT ONE OPTION
If George is testing in order to check the stability of a system for a specific period of time in an operational system context, what type of testing is MOST appropriate?
SELECT ONE OPTION
정답: B
설명: (ExamPassdump 회원만 볼 수 있음)