문제1
Which of the following is NOT the method accounting use to cost inventory?
Which of the following is NOT the method accounting use to cost inventory?
정답: D
문제2
shows the quantities needed and when manufacturing intends to make use or use them.
shows the quantities needed and when manufacturing intends to make use or use them.
정답: D
문제3
Total customer satisfaction based on the complete experience with an organization, not just the product is known as:
Total customer satisfaction based on the complete experience with an organization, not just the product is known as:
정답: B
문제4
There is difference between measurement and standards, because:
There is difference between measurement and standards, because:
정답: B,D
문제5
The formula to calculate the period-order quantity is:
The formula to calculate the period-order quantity is:
정답: C
문제6
Much evidence is available that this ideal information system integration is not evolving within industry supply chains, since:
Much evidence is available that this ideal information system integration is not evolving within industry supply chains, since:
정답: A
문제7
When a small number of items often dominate the results achieved in any situation, this is called:
When a small number of items often dominate the results achieved in any situation, this is called:
정답: C
문제8
Which is the basic system used for locating stock?
Which is the basic system used for locating stock?
정답: D
문제9
The objective of the MRP is to have:
The objective of the MRP is to have:
정답: D
문제10
Any changes can be made to the MPS as long as it is within the limits set by the production plan. Changes are routine and are often made by the computer program. This is the scenario in zone of time fence.
Any changes can be made to the MPS as long as it is within the limits set by the production plan. Changes are routine and are often made by the computer program. This is the scenario in zone of time fence.
정답: D
문제11
For a particular commodity, the line-haul cost is $2.50 per mile. For a trip of 500 miles and a shipment of 600 cwt., what is the cost of shipping cwt.? If this shipment is increased to 1000 cwt., what is the saving in cost per cwt.?
For a particular commodity, the line-haul cost is $2.50 per mile. For a trip of 500 miles and a shipment of 600 cwt., what is the cost of shipping cwt.? If this shipment is increased to 1000 cwt., what is the saving in cost per cwt.?
정답: A
문제12
If shippers want to reduce transportation cost, they should:
If shippers want to reduce transportation cost, they should:
정답: C
문제13
The information for the CRP inputs can be obtained from:
The information for the CRP inputs can be obtained from:
정답: A
문제14
The planning horizon is the time span for which plans are made. It must cover a period at least equal to the time required to accomplish the plan. For Mater production scheduling, the minimum planning horizon is:
The planning horizon is the time span for which plans are made. It must cover a period at least equal to the time required to accomplish the plan. For Mater production scheduling, the minimum planning horizon is:
정답: C
문제15
The probability of rejecting a good lot is called the consumer's risk.
The probability of rejecting a good lot is called the consumer's risk.
정답: B