최신IBM Assessment: Power Systems with POWER7 and IBM i Technical Sales Skills -v2 - A4040-226무료샘플문제
문제1
A customer has an IBM i host partition with 3 IBM i client partitions. All client partitions only perform their full system backups using a shared LTO-5 tape drive.
Which of the following is a valid consideration in this environment?
A customer has an IBM i host partition with 3 IBM i client partitions. All client partitions only perform their full system backups using a shared LTO-5 tape drive.
Which of the following is a valid consideration in this environment?
정답: B
문제2
A customer will be upgrading to a new POWER7+ server running IBM i 7.1. This customer is currently running IBM i 6.1 and uses AnyNet for SNA connectivity over TCP/IP. What must be configured to allow this customer to continue to receive IBM support for problems which may occur with the TCP/IP-based SNA connectivity?
A customer will be upgrading to a new POWER7+ server running IBM i 7.1. This customer is currently running IBM i 6.1 and uses AnyNet for SNA connectivity over TCP/IP. What must be configured to allow this customer to continue to receive IBM support for problems which may occur with the TCP/IP-based SNA connectivity?
정답: C
문제3
A P0WER6 customer with IBM i is migrating to a new POWER7 server and wants to transfer their existing IBM i processor entitlements.
What is required for the donor and receiving machines to qualify for the transfer?
A P0WER6 customer with IBM i is migrating to a new POWER7 server and wants to transfer their existing IBM i processor entitlements.
What is required for the donor and receiving machines to qualify for the transfer?
정답: A
문제4
A customer that has a 4-core Power 720 with one dedicated IBM i partition wants additional storage to improve usable space and performance. Eight disks are already installed in the front cage. Which option will support the customer requirements?
A customer that has a 4-core Power 720 with one dedicated IBM i partition wants additional storage to improve usable space and performance. Eight disks are already installed in the front cage. Which option will support the customer requirements?
정답: A
문제5
Why would a customer install an IBM i Technology Refresh?
Why would a customer install an IBM i Technology Refresh?
정답: D
문제6
A P0WER7 customer wants IBM i to host the storage for client IBM i partitions but is concerned about a single hosting partition being a single point of failure.
Which of the following would address the customer's concern?
A P0WER7 customer wants IBM i to host the storage for client IBM i partitions but is concerned about a single hosting partition being a single point of failure.
Which of the following would address the customer's concern?
정답: C
문제7
Which of the following is a method to increase fault tolerance and reduce potential outages from network equipment failures downstream from the IBM i environment?
Which of the following is a method to increase fault tolerance and reduce potential outages from network equipment failures downstream from the IBM i environment?
정답: A