최신IBM Power Systems with POWER7 Common Technical Sales Skills - v1 - 000-106무료샘플문제
문제1
A customer has a POWER6 520 system with 6 partitions. They plan to upgrade their system and need to determine the current hardware configuration of the partitions before making any upgrade decisions.What is needed to read the exported system plan and design the new system?
A customer has a POWER6 520 system with 6 partitions. They plan to upgrade their system and need to determine the current hardware configuration of the partitions before making any upgrade decisions.What is needed to read the exported system plan and design the new system?
정답: B
문제2
A customer has a 32-core Power 770 with 4 AIX partitions and 2 IBM i partitions. They want to improve network availability and allow for concurrent maintenance. What will support the customer requirement at least cost?
A customer has a 32-core Power 770 with 4 AIX partitions and 2 IBM i partitions. They want to improve network availability and allow for concurrent maintenance. What will support the customer requirement at least cost?
정답: B
문제3
A customer has a Power 770 running an SAP ERP workload on AIX 7. It has a single partition with 12 cores and 48GB of memory and the CPU is underutilized at 46% with 1000 users. Memory utilization is at 80%. The number of users will increase to 1700, increasing memory utilization by 37%.Which of the following supports this requirement?
A customer has a Power 770 running an SAP ERP workload on AIX 7. It has a single partition with 12 cores and 48GB of memory and the CPU is underutilized at 46% with 1000 users. Memory utilization is at 80%. The number of users will increase to 1700, increasing memory utilization by 37%.Which of the following supports this requirement?
정답: A
문제4
A system is being designed with many LPARs which will be clients of dual VIO Servers. The VIO Servers must be redundant so that, in the event of scheduled maintenance, the clients do not need to be shut down.Which of these strategies could be used to ensure that the client LPARs continue to be able to use the network in the event of a VIO Server being shut down?
A system is being designed with many LPARs which will be clients of dual VIO Servers. The VIO Servers must be redundant so that, in the event of scheduled maintenance, the clients do not need to be shut down.Which of these strategies could be used to ensure that the client LPARs continue to be able to use the network in the event of a VIO Server being shut down?
정답: C
문제5
A customer with limited rack space wants to purchase a 4-core POWER7 server with a total of four 8Gb Fibre Channel adapters and four 2-port Ethernet adapters. Which server is the least expensive solution that meets the customer's
requirements?
A customer with limited rack space wants to purchase a 4-core POWER7 server with a total of four 8Gb Fibre Channel adapters and four 2-port Ethernet adapters. Which server is the least expensive solution that meets the customer's
requirements?
정답: C
문제6
What System Planning Tool function will provide a graphical image of the chassis and the partition information?
What System Planning Tool function will provide a graphical image of the chassis and the partition information?
정답: A