문제1
Why is the program predictability measure the primary Metric used during the quantitative measurement part of the Inspect and Adapt event?
Why is the program predictability measure the primary Metric used during the quantitative measurement part of the Inspect and Adapt event?
정답: C
설명: (ExamPassdump 회원만 볼 수 있음)
문제2
Which statement is true about work in process (WIP)?
Which statement is true about work in process (WIP)?
정답: B
설명: (ExamPassdump 회원만 볼 수 있음)
문제3
If the distance between the arrival and departure curves on a team's cumulative flow diagram is growing apart, what is likely happening?
If the distance between the arrival and departure curves on a team's cumulative flow diagram is growing apart, what is likely happening?
정답: B
설명: (ExamPassdump 회원만 볼 수 있음)
문제4
What are two characteristics of teams that fear conflict? (Choose two.)
What are two characteristics of teams that fear conflict? (Choose two.)
정답: A,E
설명: (ExamPassdump 회원만 볼 수 있음)
문제5
A team integrates and tests the Stories on the last day of the Iteration. This has become a pattern for the last three Iterations. Why is this considered an anti-pattern?
A team integrates and tests the Stories on the last day of the Iteration. This has become a pattern for the last three Iterations. Why is this considered an anti-pattern?
정답: C
설명: (ExamPassdump 회원만 볼 수 있음)
문제6
Which statement is true about large Stories?
Which statement is true about large Stories?
정답: B
설명: (ExamPassdump 회원만 볼 수 있음)
문제7
What is one problem with phase-gate Milestones?
What is one problem with phase-gate Milestones?
정답: C
설명: (ExamPassdump 회원만 볼 수 있음)