문제1
For Energy and Atmosphere Credit, Advanced Energy Metering, which individual end uses are required to be metered?
For Energy and Atmosphere Credit, Advanced Energy Metering, which individual end uses are required to be metered?
정답: B
설명: (ExamPassdump 회원만 볼 수 있음)
문제2
The minimum amount of renovation or new construction work required to qualify for Materials and Resources Credit, Purchasing - Facility Maintenance and Renovations is
The minimum amount of renovation or new construction work required to qualify for Materials and Resources Credit, Purchasing - Facility Maintenance and Renovations is
정답: B
설명: (ExamPassdump 회원만 볼 수 있음)
문제3
In following the Sheet Metal and Air Conditioning National Contractors Association (SMACNA) Indoor Air Quality (IAQ) Guidelines for Occupied Buildings under Construction, what is the Minimum Efficiency Reporting Value (MERV) as determined by ASHRAE 52.2-2007 required for renovation activities?
In following the Sheet Metal and Air Conditioning National Contractors Association (SMACNA) Indoor Air Quality (IAQ) Guidelines for Occupied Buildings under Construction, what is the Minimum Efficiency Reporting Value (MERV) as determined by ASHRAE 52.2-2007 required for renovation activities?
정답: C
설명: (ExamPassdump 회원만 볼 수 있음)
문제4
How is the energy baseline determined in Minimum Energy Performance if the building type is not addressed by the ENERGY STAR rating tool?
How is the energy baseline determined in Minimum Energy Performance if the building type is not addressed by the ENERGY STAR rating tool?
정답: B
설명: (ExamPassdump 회원만 볼 수 있음)
문제5
A district energy system provides chilled and hot water to a building on a campus. What equipment must be commissioned to meet the requirements of Energy and Atmosphere Credit, Existing Building Commissioning
- Analysis, Option 1. Existing Building Commissioning?
A district energy system provides chilled and hot water to a building on a campus. What equipment must be commissioned to meet the requirements of Energy and Atmosphere Credit, Existing Building Commissioning
- Analysis, Option 1. Existing Building Commissioning?
정답: C
설명: (ExamPassdump 회원만 볼 수 있음)
문제6
A property manager is evaluating various bids from pest management services. Which of the following service certifications would assist the existing building in achieving Indoor Environmental Quality Credit, Integrated Pest Management?
A property manager is evaluating various bids from pest management services. Which of the following service certifications would assist the existing building in achieving Indoor Environmental Quality Credit, Integrated Pest Management?
정답: C
설명: (ExamPassdump 회원만 볼 수 있음)
문제7
Which of the following appliances are included in Water Efficiency Prerequisite, Indoor Water Use Reduction?
Which of the following appliances are included in Water Efficiency Prerequisite, Indoor Water Use Reduction?
정답: A
설명: (ExamPassdump 회원만 볼 수 있음)
문제8
What requirement must be met when creating a demand response program that satisfies Energy and Atmosphere Credit, Demand Response?
What requirement must be met when creating a demand response program that satisfies Energy and Atmosphere Credit, Demand Response?
정답: A
설명: (ExamPassdump 회원만 볼 수 있음)
문제9
For the Optimize Energy Performance Credit, ENERGY STAR eligible buildings may earn
For the Optimize Energy Performance Credit, ENERGY STAR eligible buildings may earn
정답: B
설명: (ExamPassdump 회원만 볼 수 있음)
문제10
In densely populated rooms, CO2 monitors must be located a minimum of how many feet (meters) above the floor?
In densely populated rooms, CO2 monitors must be located a minimum of how many feet (meters) above the floor?
정답: D
설명: (ExamPassdump 회원만 볼 수 있음)
문제11
Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies requires a project building to employ permanent entryway systems. How long must the entryway system be in the primary direction of travel?
Indoor Environmental Quality Credit, Enhanced Indoor Air Quality Strategies requires a project building to employ permanent entryway systems. How long must the entryway system be in the primary direction of travel?
정답: B
설명: (ExamPassdump 회원만 볼 수 있음)
문제12
Which refrigerant was phased out due to the Montreal Protocol?
Which refrigerant was phased out due to the Montreal Protocol?
정답: A
설명: (ExamPassdump 회원만 볼 수 있음)
문제13
What is the maximum allowed performance period defined for re-certification of a LEED Operations and Maintenance building?
What is the maximum allowed performance period defined for re-certification of a LEED Operations and Maintenance building?
정답: B
설명: (ExamPassdump 회원만 볼 수 있음)
문제14
The project team has been directed by the building owner to only pursue practices that directly improve the actual building performance. Which of the following would be the lowest cost option?
The project team has been directed by the building owner to only pursue practices that directly improve the actual building performance. Which of the following would be the lowest cost option?
정답: D
설명: (ExamPassdump 회원만 볼 수 있음)
문제15
Discussing the project goals to help identify the credits and options that the team should attempt is an example of
Discussing the project goals to help identify the credits and options that the team should attempt is an example of
정답: A
설명: (ExamPassdump 회원만 볼 수 있음)