문제1
Which of the following is a typical use of risk analysis?
Which of the following is a typical use of risk analysis?
정답: B
설명: (ExamPassdump 회원만 볼 수 있음)
문제2
Which two of the following are considered to be advantages when specifying detailed test conditions?
a) They may influence development activities.
b) They form the basis for vertical traceability
c) They are suited to agile methodology
d) They can aid defect prevention
e) They are quick and easy to deliver
SELECT ONE OPTION
Which two of the following are considered to be advantages when specifying detailed test conditions?
a) They may influence development activities.
b) They form the basis for vertical traceability
c) They are suited to agile methodology
d) They can aid defect prevention
e) They are quick and easy to deliver
SELECT ONE OPTION
정답: D
문제3
Which combination matches the four cost of quality categories with a CORRECT example of its category?
Which combination matches the four cost of quality categories with a CORRECT example of its category?
정답: A
설명: (ExamPassdump 회원만 볼 수 있음)
문제4
Which testing metric identifies defect density?
Which testing metric identifies defect density?
정답: C
설명: (ExamPassdump 회원만 볼 수 있음)
문제5
Which of the following statements correctly describes a 'depth-first approach' to managing risk based testing?
SELECT ONE OPTION
Which of the following statements correctly describes a 'depth-first approach' to managing risk based testing?
SELECT ONE OPTION
정답: D
문제6
Which of the following organizational structures would be considered unorthodox?
Which of the following organizational structures would be considered unorthodox?
정답: A
설명: (ExamPassdump 회원만 볼 수 있음)
문제7
SoftTech provides a core banking product to retail banks to enable their customers to process payments via the Internet and telephone banking and. as SoftTech's Test Manager, you are responsible for system testing and system integration testing of all SoftTech's products.
Your current project is to integrate SoftTech's core banking product with an existing bank's systems, which are maintained by experienced developers but poorly documented.
A specification for the 10 interfaces to the bank's existing systems has been produced by SoftTech's development team. There is an estimating matrix for system integration testing that allows 2 man days per interface for preparation, plus 2 man days per interface for test execution. The exit criteria for the completion of system integration testing has been agreed as:
1. No open Severity 1 defects
2. No more than 10 open severity 2 and/or 3 defects
3. All interfaces tested
4. Cost estimate must not be exceeded
System integration test execution is scheduled to last 5 weeks, with week 5 reserved for regression and bug fixing only. At the end of week 3 the following test report has been produced (figures on a week by week basis, not cumulative):

b. Open severity 2 and 3 defects
c. Interface testing progress
d. Development resource for debugging
e. Available budget
SELECT ONE OPTION
SoftTech provides a core banking product to retail banks to enable their customers to process payments via the Internet and telephone banking and. as SoftTech's Test Manager, you are responsible for system testing and system integration testing of all SoftTech's products.
Your current project is to integrate SoftTech's core banking product with an existing bank's systems, which are maintained by experienced developers but poorly documented.
A specification for the 10 interfaces to the bank's existing systems has been produced by SoftTech's development team. There is an estimating matrix for system integration testing that allows 2 man days per interface for preparation, plus 2 man days per interface for test execution. The exit criteria for the completion of system integration testing has been agreed as:
1. No open Severity 1 defects
2. No more than 10 open severity 2 and/or 3 defects
3. All interfaces tested
4. Cost estimate must not be exceeded
System integration test execution is scheduled to last 5 weeks, with week 5 reserved for regression and bug fixing only. At the end of week 3 the following test report has been produced (figures on a week by week basis, not cumulative):

b. Open severity 2 and 3 defects
c. Interface testing progress
d. Development resource for debugging
e. Available budget
SELECT ONE OPTION
정답: B
문제8
When closing out a defect report, which of the following developer commentaries is most likely to motivate a tester?
When closing out a defect report, which of the following developer commentaries is most likely to motivate a tester?
정답: D
설명: (ExamPassdump 회원만 볼 수 있음)
문제9
Which one of the following is NOT a determining factor when considering the optimal time to conduct a document review? SELECT ONE OPTION
Which one of the following is NOT a determining factor when considering the optimal time to conduct a document review? SELECT ONE OPTION
정답: B